>
Inspection |
1. |
Measure the pressure of high pressure line by measuring voltage output between terminal “1” and “2”. |
2. |
Inspect the voltage value whether it is sufficient to be regular value or not.
|
3. |
If the measured voltage value is not wihtin specification, replace the A/C pressure transducer. |
Replacement |
1. |
Disconnect the negative (-) battery terminal. |
2. |
Recover the refrigerant with a recovery/charging station. |
3. |
Disconnect the A/C pressure transducer connector (A). |
4. |
Remove the A/C pressure transducer (A).
|
5. |
Install in the reverse order of removal.
|
Positive Crankcase Ventilation (PCV) Valve Description and Operation
Operation Principle
...
Troubleshooting
Troubleshooting
1.
After replacing multi-view camera unit, always check that the system operates properly.
2.
If the failure persists after replacing the multi-view camer ...
Underdrive Brake Control Solenoid Valve(UD/B_VFS) Specifications
Specifications
Direct control VFS[UD/C]
x Control type : Normal low type
Control Pressure kpa (kgf/cmx, psi)0~1569.06 (0~16,0~227.57)Current value(mA)0~1100 Internal resistance ...