>
Inspection |
1. |
Disconnect the negative (-) battery terminal. |
2. |
Pull out the relay from the engine compartment relay box. |
|
1. |
There should be continuity between the No.30 and No.87
terminals when power and ground are connected to the No.85 and No.86
terminals. |
2. |
There should be no continuity between the No.30 and No.87 terminals when power is disconnected. |
1. |
There should be continuity between the No.30 and No.87
terminals when power and ground are connected to the No.85 and No.86
terminals. |
2. |
There should be no continuity between the No.30 and No.87 terminals when power is disconnected. |
1. |
There should be continuity between the No.30 and No.87
terminals when power and ground are connected to the No.85 and No.86
terminals. |
2. |
There should be continuity between the No.30 and No.87 terminals when power is disconnected.
A : ECU relay |
1. |
Be sure there is no play in the fuse holders, and that the fuses are held securely. |
2. |
Are the fuse capacities for each circuit correctx |
3. |
Are there any blown fusesx
If a fuse is to be replaced, be sure to use a new fuse of the
same capacity. Always determine why the fuse blew first and completely
eliminate the problem before installing a new fuse. |
Transmission Oil Temperature Sensor Schematic Diagrams
Circuit Diagram
...
Fuel Tank Pressure Sensor (FTPS) Repair procedures
Inspection
1.
Connect the GDS on the Data Link Connector (DLC).
2.
Measure the output voltage of the FTPS.
Specification: Refer to "Specification"
Removal
1.
Turn the ignition swit ...
Schematic Diagrams
Schematic Diagram
...